Hydraulic Acceptance Inspection Tag
Hydraulic Elevator Acceptance Inspection Tag
The ALL-011 Hydraulic Acceptance Inspection Tag provides a permanent, mount-at-elevator record of the acceptance inspection for new hydraulic elevator installations. Available in both ASME A17.1-2019/CSA B44:19 and ASME A17.1-2025/CSA B44:25 editions — specify which edition you require when ordering.
Acceptance inspections are required before any new elevator can be placed into service, and the record of that inspection must be retained. This tag serves as the permanent on-unit record, complementing the formal inspection report that travels with the Maintenance Control Program.
The 5" × 7" portrait format provides adequate space for the comprehensive acceptance checklist. 3M adhesive backing allows mounting directly at the controller upon completion of acceptance testing, as required by Section 8.10.1.1.4.
- Available in both 2019 and 2025 editions of ASME A17.1 / CSA B44
- Complete hydraulic acceptance test checklist for the specified code edition
- 5" × 7" portrait — full acceptance item matrix
- 3M adhesive mount — stays with the elevator
- Laser engraved base markings, fill-in fields
- Complements the Maintenance Control Program documentation
FAQ
What is a hydraulic elevator acceptance inspection?
An acceptance inspection is performed on all newly installed hydraulic elevators before they are placed into service. ASME A17.1 Section 8.10.1.1.4 defines the acceptance inspection requirements. Consult the code for the complete list.
Does this tag stay mounted at the elevator?
Yes. Per ASME A17.1 Section 8.10.1.1.4 defines the acceptance inspection requirements. Consult the code for the complete list.
How do I order acceptance inspection tags?
Email apexlaserlabs@gmail.com with your quantity and shipping location. Pricing is quoted per order.